GW Hospital – Swindon

Brunel Scaffolding completed the erection of a designed loading bay for Great Western Hospitals new MRI scanner. The work was completed over two phase, the first was to remove the windows and the second was the final erection of the loading bay for the scanner to be lowered onto.

IMG_4303IMG_4299

IMG_4302

Comments are closed.